Framing Pics and First Oops!

My wife had to meet Guardian today to go over some areas of installation because the previous left the company.  This afforded her the opportunity to walk around the house see the progress from the inside.

But first, my wife did notice that something wasn't right about the basement.  In the Venice Model, the basement is roughed in for a potential full bath.  If you don't choose the full bath, they still frame it in and basically turn it into a small storage room, why, I don't know.  We didn't want the small room as we wanted the extra open space for the finished basement.  But guess what?  They were framing in the storage space.  And guess what, to not have that room there, they charged us more.  I don't remember exactly how much, but trust me, they saved money by not having the room framed.

In the pic below, in front of the hard working Amish gentlemen is the room.  As you can see, it takes up a good amount of open space in the basement.  We sent this pic to the PM and responded that it will be taken care of right away.


Here are the rest of the pics.

Garage


Living Room with fireplace


Bedroom #3


Walk-in Closet




























Morning Room



Master Bath


Living Room and Main Entrance



Top of the landing looking into second floor full bath.  Amish not included.


Kitchen, Morning Room & Family Room




Master Bedroom with Master Bath on the right